Modern railway engineering consultation : (Record no. 124964)

MARC details
000 -LEADER
fixed length control field 05894cam a2200445 i 4500
001 - CONTROL NUMBER
control field 20350781
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20220304162113.0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180208s2018 njua b 000 0 eng
010 ## - LIBRARY OF CONGRESS CONTROL NUMBER
LC control number 2018006267
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9789813238879
Qualifying information (hardcover)
040 ## - CATALOGING SOURCE
Original cataloging agency DLC
Language of cataloging eng
Transcribing agency HNU
Description conventions rda
Modifying agency DLC
041 1# - LANGUAGE CODE
Language code of text/sound track or separate title eng
Language code of original chi
042 ## - AUTHENTICATION CODE
Authentication code pcc
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TF146
Item number .Y5613 2018
066 ## - CHARACTER SETS PRESENT
Alternate G0 or G1 character set $1
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 625.1 Z61 2018
Edition number 23
Placement Code GC
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Zhu, Ying,
Dates associated with a name 1963-
Relator term author.
240 10 - UNIFORM TITLE
Linkage 880-01
Uniform title Xian dai tie lu gong cheng zi xun.
Language of a work English
245 10 - TITLE STATEMENT
Title Modern railway engineering consultation :
Remainder of title methods and practices /
Statement of responsibility, etc. Zhu Ying, Chen Lie, China Railway Eryuan Engineering Group Co. Ltd, China.
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Hackensack, New Jersey :
Name of producer, publisher, distributor, manufacturer World Scientific,
Date of production, publication, distribution, manufacture, or copyright notice ©2018.
300 ## - PHYSICAL DESCRIPTION
Extent xvii, 357 pages :
Other physical details illustrations ;
Dimensions 24 cm
336 ## - CONTENT TYPE
Content type term text
Content type code txt
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Media type code n
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Carrier type code nc
Source rdacarrier
500 ## - GENERAL NOTE
General note Translated from the Chinese.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references (pages 355-357).
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Intro; Contents; Introduction; About the Authors; Preface; Chapter 1. Development and Technical Characteristics of Railways; 1.1 Overseas High-speed Railway Development; 1.1.1 Overview; 1.1.2 Development history; 1.1.3 Technical characteristics; 1.2 Speeding-up Reconstruction of Railways in China; 1.2.1 Speeding-up tests and speeding-up reconstruction; 1.2.2 Speeding-up reconstruction technologies; 1.3 Medium and Long-term Plans for China's Railways; 1.4 Main Types of China's Passenger Dedicated Railways; 1.5 China's Construction Technologies for High-speed Railways. 1.5.1 Foundational engineering technologies1.5.2 Technologies of four electric systems (traction feeding, power supply, signaling and communication systems); 1.5.3 Noise control and sound barrier technologies; 1.6 History of High-speed Railway Development in China; Chapter 2. Management of Railway Engineering Consultation; 2.1 Construction Process and Management of China's Railways; 2.2 Organization Structure for Railway Engineering Consultation and Responsibilities of Key Personnel; 2.2.1 Project manager; 2.2.2 Chief consultant; 2.2.3 Discipline consultation director. 2.2.4 Planning and management director2.2.5 Project risk management director; 2.3 Consultation Quality Plan; 2.4 Control of Consultation Process; 2.5 Control of Consultation Results; 2.5.1 Preparation of consultation reports; 2.5.2 Assessment and modification of consultation results; 2.5.3 Control of unqualified consultation service; 2.6 Consultation Management Systems; 2.6.1 Administrative management systems; 2.6.2 Technical management systems; 2.7 Working Procedures of Consultation; 2.7.1 Design optimization consultation; 2.7.2 Construction drawing review consultation. 2.7.3 Construction process consultation2.7.4 Special consultation; 2.8 Consultation Risk Management; 2.8.1 Overall requirements; 2.8.2 Basic procedures; 2.8.3 Treatment and monitoring of risks; 2.8.4 Responsibilities in risk management; 2.8.4.1 Responsibilities of the employer; 2.8.4.2 Project manager; 2.8.4.3 Project risk management director; 2.8.5 Risk management procedures; 2.8.6 Risk management methods; Chapter 3. Methods for Railway Engineering Consultation; 3.1 Overview; 3.2 Stage Division of Consultation Work; 3.2.1 Consultation preparation stage. 3.2.2 Consultation implementation stage3.2.3 Consultation result forming stage; 3.3 Investigation Method; 3.3.1 Definition; 3.3.2 Classification; 3.3.2.1 Descriptive investigation method; 3.3.2.2 Explanatory investigation method; 3.3.2.3 Longitudinal investigation method; 3.3.2.4 Lateral investigation method; 3.3.2.5 Overall investigation method; 3.3.2.6 Interrelation investigation method; 3.3.3 Characteristics and precautions; 3.4 Observation Method; 3.4.1 Definition; 3.4.2 Classification; 3.4.3 Characteristics and precautions; 3.5 Experiment Method; 3.5.1 Definition; 3.5.2 Classification.
520 ## - SUMMARY, ETC.
Summary, etc. "Report on the rapid development of railway engineering construction in China, this book introduces the basic concepts of railway engineering supported by reference to cases. This book underpins the experiences and technologies of the Chinese engineering sector in railway construction and explores systematic and optimal design in safety, reliability, applicability, economy, durability, systematic nature and interface in relation to railway engineering, and construction, to ensure the quality control at every stage of the process. The authors of this book have long been engaged in the design, consultation and research of railways and directed the engineering consultation on many high-speed railways in China, including Beijing-Shanghai High-speed Railway and Wuhan-Guangzhou Passenger Dedicated Railway. This book was compiled on the basis of the systematic analysis and summary of railway engineering consultation and in consideration of engineering consultation practices. This book is an excellent reference for relevant personnel engaged in the management, design, consultation and construction of railways and teachers and students in universities and colleges."--Publisher's website
521 ## - TARGET AUDIENCE NOTE
Target audience note College of Engineering and Computer Studies
Source Bachelor of Science in Civil Engineering
546 ## - LANGUAGE NOTE
Language note Text in English<br/>Translated from the Chinese.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Railroad engineering.
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Chen, Lie,
Dates associated with a name 1962-
Relator term author.
880 10 - ALTERNATE GRAPHIC REPRESENTATION
Linkage 240-01/$1
a 现代铁路工程咨询.
l English
906 ## - LOCAL DATA ELEMENT F, LDF (RLIN)
a 7
b cbc
c orignew
d 1
e ecip
f 20
g y-gencatlg
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Books
Classification part 600-699
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Home library Current library Shelving location Date acquired Source of acquisition Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     GC College Library College Library General Circulation Section 08/11/2020 Library Fund   GC 625.1 Z61 2018 HNU002614 08/29/2024 03/04/2022 Books