000 02058cam a22004217i 4500
999 _c35255
_d35255
001 18960986
003 OSt
005 20220914160630.0
007 ta
008 160203t20162016enkae 001 0 eng d
010 _a 2016932472
020 _a0128020695
020 _a9780128020692 (pbk)
035 _a(OCoLC)ocn928780160
040 _beng
_cHNU
_erda
042 _alccopycat
050 0 0 _aTG315
_b.H87 2016
082 0 4 _223
_3GC
_a338.132 H94 2016
100 1 _aHurt, Mark,
_eauthor.
245 1 0 _aHighway bridge maintenance planning and scheduling /
_cMark Hurt, Steven D. Schrock.
264 1 _aOxford, U.K. :
_bButterworth-Heinemann Ltd,
_c©2016.
264 4 _c©2016.
_aOxford, U.K. :
_bButterworth-Heinemann Ltd, is an imprint of Elsevier,
300 _aix, 337 pages :
_billustrations ;
_c23 cm
336 _atext
_btxt
_2rdacontent
337 _aunmediated
_bn
_2rdamedia
338 _avolume
_bnc
_2rdacarrier
504 _aIncludes bibliographical references and index.
505 _a1. Introduction 2. Bridge Elements and Materials 3. Bridge Inspection and Evaluation 4. Preventative Maintenance 5. Substantial Maintenance and Rehabilitation 6. Bridge Life Cycle Costing 7. Bridge Management
520 _a"Provides Bridge Maintenance Engineers with practical advice for creating an effective maintenance program that will allow them to not only plan, schedule, direct, and monitor highway bridge repair and rehabilitation project[s] but also evaluate all completed work for technical acceptability, productivity, and unit-cost standards"--Back cover.
521 _aCOECS
_bBachelor of Science in Civil Engineering
546 _aText in English
650 0 _aBridges
_xMaintenance and repair.
700 1 _aSchrock, Steve
_q(Steven Dale),
_eauthor.
906 _a7
_bcbc
_ccopycat
_d2
_encip
_f20
_gy-gencatlg
942 _2ddc
_cBK
_h300-399